Understanding FM 1-52
There are two recognized field test methods for determining uplift resistance of adhered membrane roof systems, both of which can be problematic:
However, ASTM E907 and FM 1-52 differ notably in their test cycles and maximum test pressures for determining roof system deflections and whether a roof system passes or is “suspect”.
For example, when testing an adhered roof system over a steel roof deck, placement of the test chamber relative to the deck supports (bar joists) can have a significant effect on the test results. If positioned between deck supports, the test chamber's deflection gauge will measure roof assembly deflection at the deck's midspan, which is the point of maximum deck deflection. Also, in many instances, field-uplift testing results in steel roof deck overstress and deck deflections far in excess of design values, which can result in roof system failure. These situations can result in false “suspect” determinations of a roof system.
Industry position/recommendations
Because of the known variability in test results using ASTM E907 and FM 1-52 and the lack of correlation between laboratory uplift-resistance testing and field-uplift testing, the roofing industry considers field-uplift testing to be inappropriate for use as a post-installation quality-assurance measure for membrane roof systems.
Conclusion
FM 1-52 is an FM Global-promulgated evaluation method and not a recognized industry-consensus test standard. The scope of FM 1-52 indicates that it’s only intended to confirm acceptable wind-uplift resistance on completed roof systems in hurricane-prone regions, where a partial blow-off has occurred, or where inferior roof system construction is suspected or known to be present.
FM 1-52 was originally published by FM Global in October 1970. The negative-pressure uplift test was added in August 1980 and has been revised several times. The current edition is dated July 2012 and includes an option for "visual construction observation (VCO)" as an alternative to negative-pressure uplift testing. VCO provides for full-time, third-party monitoring to verify roof system installation is in accordance with contract documents.
For more information, contact Craig Tyler.
- ASTM E907, "Standard Test Method for Field Testing Uplift Resistance of Adhered Membrane Roofing Systems," and
- FM Global Loss Prevention Data Sheet 1-52 (FM 1-52), "Field Verification of Roof Wind Uplift Resistance."
Both test methods provide for affixing a 5’ x 5’ dome-like chamber to the roof’s surface and applying a defined negative (uplift) pressure inside the chamber to the roof system's exterior-side surface using a vacuum pump, like in the photo below.
An example of a test chamber used for negative-pressure uplift testing
However, ASTM E907 and FM 1-52 differ notably in their test cycles and maximum test pressures for determining roof system deflections and whether a roof system passes or is “suspect”.
- Using ASTM E907, a roof system is “suspect” if the deflection measured during the test is 25 mm (about 1 inch) or greater.
- Using FM 1-52, a roof system is “suspect” if the measured deflection is between ¼ of an inch and 15/16 of an inch, depending on the maximum test pressure; 1 inch where a thin cover board is used; or 2 inches where a thin cover board or flexible, mechanically attached insulation is used.
Test results' reliability
The reliability of the results derived from ASTM E907 and FM 1-52 is a concern, especially when the tests are used for quality assurance purposes. A note in ASTM E907 acknowledges its test viability.
"Deflection due to negative pressure will potentially vary at different locations because of varying stiffness of the roof system assembly. Stiffness of a roof system assembly, including the deck, is influenced by the location of mechanical fasteners, thickness of insulation, stiffness of deck, and by the type, proximity, and rigidity of connections between the deck and framing system."
For example, when testing an adhered roof system over a steel roof deck, placement of the test chamber relative to the deck supports (bar joists) can have a significant effect on the test results. If positioned between deck supports, the test chamber's deflection gauge will measure roof assembly deflection at the deck's midspan, which is the point of maximum deck deflection. Also, in many instances, field-uplift testing results in steel roof deck overstress and deck deflections far in excess of design values, which can result in roof system failure. These situations can result in false “suspect” determinations of a roof system.
Industry position/recommendations
Because of the known variability in test results using ASTM E907 and FM 1-52 and the lack of correlation between laboratory uplift-resistance testing and field-uplift testing, the roofing industry considers field-uplift testing to be inappropriate for use as a post-installation quality-assurance measure for membrane roof systems.
Conclusion
FM 1-52 is an FM Global-promulgated evaluation method and not a recognized industry-consensus test standard. The scope of FM 1-52 indicates that it’s only intended to confirm acceptable wind-uplift resistance on completed roof systems in hurricane-prone regions, where a partial blow-off has occurred, or where inferior roof system construction is suspected or known to be present.
FM 1-52 was originally published by FM Global in October 1970. The negative-pressure uplift test was added in August 1980 and has been revised several times. The current edition is dated July 2012 and includes an option for "visual construction observation (VCO)" as an alternative to negative-pressure uplift testing. VCO provides for full-time, third-party monitoring to verify roof system installation is in accordance with contract documents.
For more information, contact Craig Tyler.
Up Next
August 07, 2019
LEED, Green Globes, and Living Building Challenge
For years, "going green" initiatives have been popping up in all aspects of our lives.
August 05, 2019
SpecTips - Tips for Specifying Carlisle Edge Metal and the Edge-to-Edge Warranty
Specify SecurEdge or Shop-Fabricated Metal for inclusion in Carlisle’s Edge-to-Edge Warranty
July 24, 2019
Solar Ready Roofing
As designers and architects try to meet green construction or net-zero energy goals, on-site power generation in the form of photovoltaic (PV) arrays is becoming more and more common.